Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187
BOFU plastic formwork system
Categories: company news

BOFU at BATIMAT


Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187
BOFU plastic formwork system

BATIMAT is the world’s leading construction exhibition. It brings together the most comprehensive array of products, equipment and services in the world and the largest number of French and international professionals (developers, specifiers, contractors and distributors).

BOFU will attend BATIMAT exhibition 2013 at Paris, France, welcome to visit us.

BOFU plastic formwork system
Admin

Share
Published by
Admin
Tags: exhibition

Recent Posts

  • Blog

Analysis of the application process principle of early-demolition formwork in construction Ⅳ

4 Construction points for early dismantling of formwork   4.1 Enhance the technical application ability of construction personnel On the…

2 years ago
  • Blog

Analysis of the application process principle of early-demolition formwork in construction Ⅲ

3 The specific application of early dismantling formwork in construction 3.1 Construction design of early dismantling formwork Before applying the…

2 years ago
  • company news

Analysis of the application process principle of early-demolition formwork in construction Ⅱ

2 The application value of early-demolition formwork technology in construction 2.1 Reduce costs and expenses Construction costs affect the economic…

2 years ago
  • company news

Analysis of the application process principle of early-demolition formwork in construction Ⅰ

Abstract: early-demolition formwork is an important part of building construction technology. By applying early dismantling formwork in construction activities, construction…

2 years ago
  • Blog
  • company news

Research on the Deepening Design of Plastic Formwork for High-rise Buildings Ⅳ

5 Development Prospects of Plastic Formwork First of all, we should deepen the design, adopt standardized design methods, optimize the…

2 years ago
  • Blog

Research on the Deepening Design of Plastic Formwork for High-rise Buildings Ⅲ

4 Plastic formwork construction technology 4.1 Analysis of operation steps of plastic template A plastic formwork support system was used…

2 years ago

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187