Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187
Analysis and Discussion on the Causes and Treatment Strategies of Concrete Cracks in Construction Formwork Engineering Ⅳ | BOFU FORMWORK AND SOLAR PRODUCTS
Categories: Blog

Analysis and Discussion on the Causes and Treatment Strategies of Concrete Cracks in Construction Formwork Engineering Ⅳ


Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187
BOFU plastic formwork system

BOFU plastic modular formwork

2.3 Improve the concrete pouring construction process

After the completion of the concrete building, preparations such as positioning, measurement, and elastic line can be carried out, but lifting and unloading of bulk materials is strictly prohibited to avoid damage to the concrete. Only after 24 hours is it allowed to arrange the lifting of small materials in batches, so as to better handle lightly, unload, and disperse in place. It is not allowed to engage in floor formwork and floor wall formwork work in 3 days, but also needs to consider the selection of reinforcement steel bars and poles to effectively increase the support stiffness of the formwork and strengthen the area’s impact resistance.

 

Old wood or springboard can also be laid in new buildings The concrete surface can protect and diffuse the stress, and effectively reduce the occurrence of floor cracks.

 

2.4 Strengthen the post-conservation work of the construction effect.

Properly increase the temperature of the curing environment can effectively reduce the cooling rate and reduce the temperature difference between the inside and the outside, which is conducive to concrete stress relaxation and strength improvement, and avoid plastic shrinkage caused by concrete surface cracks. In the concrete surface curing process, the difference between the core temperature and the surrounding temperature should be controlled within 25 ° C. In case of stormy weather, it is also necessary to build a rainproof belt to do well drainage work, to prevent rainwater from entering the foundation pit to ensure the quality of concrete construction.

 

Do the pouring and curing work of the cast-in-place plate. For the concrete construction process, concrete curing is an indispensable link. If it is not maintained as required, it will not only affect its strength, but also cause excessive water loss in the hardening stage and cause shrinkage cracks. Therefore, the concrete needs to be cured in accordance with the requirements so as to effectively control the generation of cracks.

 

The end

refer: plastic formwork for construction

BOFU plastic formwork system
Admin

Share
Published by
Admin
Tags: adjustable column formworkBuilding Concerte FormsBuilding Concrete Formscolumn formworkConcrete form companiesconcrete formsconcrete formworkconstruction formworkformworkformwork for concreteformwork for constructionformwork systemFoundation formworkmodular formworkPlastic Concrete Formsplastic formworkplastic modular formworkShuttering Panelwall formwork systems

Recent Posts

  • Blog

Analysis of the application process principle of early-demolition formwork in construction Ⅳ

4 Construction points for early dismantling of formwork   4.1 Enhance the technical application ability of construction personnel On the…

2 years ago
  • Blog

Analysis of the application process principle of early-demolition formwork in construction Ⅲ

3 The specific application of early dismantling formwork in construction 3.1 Construction design of early dismantling formwork Before applying the…

2 years ago
  • company news

Analysis of the application process principle of early-demolition formwork in construction Ⅱ

2 The application value of early-demolition formwork technology in construction 2.1 Reduce costs and expenses Construction costs affect the economic…

2 years ago
  • company news

Analysis of the application process principle of early-demolition formwork in construction Ⅰ

Abstract: early-demolition formwork is an important part of building construction technology. By applying early dismantling formwork in construction activities, construction…

2 years ago
  • Blog
  • company news

Research on the Deepening Design of Plastic Formwork for High-rise Buildings Ⅳ

5 Development Prospects of Plastic Formwork First of all, we should deepen the design, adopt standardized design methods, optimize the…

2 years ago
  • Blog

Research on the Deepening Design of Plastic Formwork for High-rise Buildings Ⅲ

4 Plastic formwork construction technology 4.1 Analysis of operation steps of plastic template A plastic formwork support system was used…

3 years ago

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187

Warning: preg_match() expects parameter 2 to be string, array given in /home/bofuform/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 1187