In Malaysia, our client use BOFU plastic formwork system for their low cost houses, with only 4 workers, for the area about 200sqm house, only need about 1 week to finish. And this is not all, generally set up formwork by traditional plywood formwork will need carpenters whose salary is the highest in workers at site, BOFU plastic formwork system here for the house did not need carpenter because of its modularity, thus save the total cost of the house.
BOFU plastic formwork system