BOFU plastic formwork system 2 Problems in construction In construction engineering, the main problem is quality. However, poor engineering quality control will often adversely affect production safety. Generally speaking, the quality problems of construction projects are related to many factors. The details are as follows: (1) The materials are not good enough. There are […]
Construction site quality control and safety management of building engineering Ⅱ
BOFU plastic formwork system 1.2 Corresponding construction techniques and methods At the construction site of a construction project, it is necessary to ensure the normal progress of the construction. On-site safety is a necessary guarantee. If a safety accident occurs, it will inevitably be suspended, which will cause the delay of the entire project progress […]
Construction site quality control and safety management of building engineering Ⅰ
BOFU plastic formwork system Abstract: For construction projects, safety issues are the most important, but the quality of the project is the premise of ensuring safety, so safety and quality are inseparable. This article analyzes and discusses the quality control and safety management of the construction site, and puts forward specific measures to solve the […]
Common Quality Problems of Construction Engineering and Management Measures Ⅳ
BOFU plastic formwork system The project uses C30 grade concrete, the amount of water is 175kg, the amount of cement is 461kg, the amount of sand is 512kg, the amount of stones is 1252kg, and the mix ratio is 0.38:1.1:1:2.72. In the process of pouring concrete, it is necessary to ensure that the position of […]
Common Quality Problems of Construction Engineering and Management Measures Ⅲ
BOFU plastic formwork system 3 Effective measures for construction project quality management In response to the above-mentioned quality problems in the project, targeted quality management measures should be taken to ensure the quality of each production and construction link, thereby ensuring the overall project safety. 3.1 Earthwork In view of the quality defects of the […]
Common Quality Problems of Construction Engineering and Management Measures Ⅱ
BOFU plastic formwork system 2.4 Concrete exposed reinforcement This disease of the project is mainly manifested in that the main and auxiliary reinforcements or stirrups inside the steel-concrete structure are exposed on the surface and are not covered by concrete. The reason for this quality disease is: the displacement of the reinforcing steel protection layer […]
Common Quality Problems of Construction Engineering and Management Measures Ⅰ
BOFU plastic formwork system Abstract: Taking a residential area as an example, the article analyzes the common quality problems existing in the project, including slope collapse in excavation, loose joints of formwork, corrosion of steel bar surface, concrete exposed reinforcement, etc., and proposes targeted quality management measures . This research provides a practical guarantee for […]
Application of Construction Technology of Anti-seismic Concrete Frame StructureⅤ
BOFU plastic formwork system BOFU plastic formwork 4 Conclusion In short, residential construction has become an important type of construction in the modern construction industry. It exhibits over-limit construction, which saves urban land resources and also brings stability and safety issues. Therefore, strengthening the design optimization of the seismic performance of residential buildings has become […]
Application of Construction Technology of Anti-seismic Concrete Frame Structure Ⅳ
BOFU plastic formwork system 3.2 Analysis of construction points of concrete engineering The application of construction materials and construction quality control of the concrete frame structure also have an impact on its seismic performance. Therefore, it is required to be able to control the quality of concrete materials in construction technology control. Building materials play […]
Application of Construction Technology of Anti-seismic Concrete Frame Structure Ⅲ
BOFU plastic formwork system 2.2 The choice of construction materials does not meet the design principles In the field construction management of the concrete frame structure of residential buildings, the application of construction materials for anti-seismic performance is not optimistic. On the one hand, it is because in the construction design link, the calculation and […]